Major Works · As needed
Underpinning.
Underpinning is the work of last resort and the most expensive thing on this list. Driven by a structural engineer's report, not by us. We can engage the engineer for you, manage the works once designed, and integrate with any other remedial work needed. This is the kind of job that takes weeks and costs five figures minimum — no indicative price will ever be meaningful until an engineer has been on site.
Indicative price
Quote on inspection
Always engineer-led. Diagnostic and structural report fees vary.
We confirm scope and final price on site before any work begins.
What's included
Scope of work.
- ·Engineering engagement
- ·Underpinning works management
- ·Integration with other remedial work
- ·Hand-off documentation
What's not included
Out of scope.
- ·Engineering fees (paid direct to engineer)
- ·Internal finishing repairs (separate quote)
Other major works
Often booked alongside.
As needed
Rising Damp Treatment
Diagnostic, treatment, and remediation of rising damp. Every job is different — always quoted on inspection.
As needed
Render Crack Repair
Diagnostic and repair of cracked render. Hairline cosmetic cracks vs structural movement get very different treatment.
As needed
Structural Timber Repair
Repair or replacement of structural timber elements. Joists, bearers, rafters, posts, balustrades.
Three details and we'll come back to you.
Address, preferred dates, anything we should know. We confirm scope and final price on site before any work begins.
