⚠ Editorial draft — pending studio review & verificationnoindex
Projects/Mosman, 2020
§ Project · 003

New build · Two-lot consolidation, builder takeover

Mosman.

[PLACEHOLDER deck — 2-3 sentences. Existing body covers the two-lot consolidation and builder takeover; rewrite into editorial register.]

Structural & DA Consultants[Placeholder]
Project LeadNick Varley
Finishes & Detailing[Placeholder]
CarpentryVarloch
Other tradesTBC
Year2020
Mosman, 2020 — primary photograph by Varloch site record.

[PLACEHOLDER caption for hero plate]

The engineering behind the design.

This project involved the unification of two adjoining properties and the takeover of a site mid-build. With approvals already in motion and work underway by a previous builder, we stepped in to bring clarity and quality control.

The plan.

We consolidated the DA and built a refined home across two formerly separate lots. Careful structural analysis was conducted to verify all prior works, and project sequencing was recalibrated to ensure delivery with minimal rework. Key challenges included terrain transitions, material changes, and aligning two differing original build standards.

§ V.

From the site record.

2020
Mosman, photograph 1
Mosman, photograph 2
Mosman, photograph 3
← Previous projectKirribilli, beneath the terrace, 2025New buildNext project →Bilgola Plateau, 2017Bilgola Plateau
Varloch Group client testimonial
NSW BuilderLic. 373007C
L2 PractitionerBUP0004294
PlumbingLic. 479776C
Public LiabilityChase Underwriting
HBCF$3M cover
Recognition2025 BOTY finalist